    In the morning of July 25, 2012, accompanied by deafening firecrackers,Laixi Songwangzhuang Overpass Separation of Longqing Expressway Projectofficially started under the responsibility of Road and Bridge Department inour company.
    The total cost for this project is 31,460,000Yuan. This bridge applies friction piles,bracket floor
, column piers, pre-stressed continuousconcrete box girder, a total of eighteen holes, length 498.06 m, width 27.5 m, 84 piles, total pilelength 2424 meters, 8946 m3 concrete for box girder.
    The difficulty for the project is the construction of third joint crossingS213 Provincial Highway without blocking the traffic. Under the leadership of Project ManagerJiangjun, the technical personnel work hard, wholly plunge into construction, overcome poor working conditions, lack of materials and equipment on-site,shortage of management staff andnumerous pipeline networks under ground. They work in accordance with the requirements of project owners in a timelymanner and make complete preparation for smooth start of the project. Currently substructure pile foundation inundergoing construction, the next step will be cap tie beam construction.